Concrete Washout Bags or Slurry Sacks neatly contained concrete pump waste by the ultra-strong bag, which is easily attached to the pump mechanism of the concrete truck for the washout and then detached when the washout is competed.
Once the bag has dried (around 24 hours), it can be moved by forklift or crane. Dried bags can be stacked on top of each other to save space.